제목 | 재난 이후, 전력 복구 향상을 위한 다기간 공급망 재구성 및 수리 일정 계획 동시 최적화 |
---|---|
Title | Co-optimizing Power Grid Operations and Repair Scheduling during Prolonged Outages |
저자 |
김하늘 (고려대학교 산업경영공학부) 윤명석 (고려대학교 전기전자공학부) 차형주 (고려대학교 산업경영공학부) 최승연 (고려대학교 전기전자공학부) 정태수* (고려대학교 산업경영공학부) |
Author |
Haneul Kim (Department of Industrial and Management Engineering, Korea University) Myungseok Yoon (Department of Electrical Engineering, Korea University) Hyungjoo Cha (Department of Industrial and Management Engineering, Korea University) Sungyun Choi (Department of Electrical Engineering, Korea University) Taesu Cheong* (Department of Industrial and Management Engineering, Korea University) |
Bibliography | Journal of Logistics Science & Technology, 5(1),1~22, 2024, |
DOI | 10.23178/jlst.5.1.202403.001 |
Key Words | Smart Grid, Power Distribution System, Repair Crew Scheduling, Network Reconfiguration, Resilience after Post disaster |
Abstract | In this study, we address the optimization problem of reducing the power restoration period after a major natural disaster. To improve the resilience of power restoration at each demand location, we schedule repairs to the fault locations along the power grid, and reconfigure the power grid as components in the grid are repaired. Most repair scheduling and network reconfiguration co-optimization problems considered only a radial network as the power grid configuration, with a small number of switches that determine whether a line is operational or not. In addition, despite the need for long-term scheduling, they approached it as a traditional scheduling problem that did not consider for off-hours. The value of this research is to propose optimal network configures and repair schedule considering off-hours and a smart grid with multiple power supply routes and power sources. To achieve this, we introduce a mixed integer linear programming and a matheuristic that takes into account the complexity of the problem. |
PDF download | JM_5[1]-P1~22.pdf |